All cables of the country's first cable-stayed rail bridge with 96 cables, a length of 725 meters and a height of 331 meters from the river bed, have been installed. With this step, Indian Railways has completed another milestone towards connecting Kashmir Valley with the rest of the rail network.
No comments:
Post a Comment